|
|
|
Pair gain systems:
- From
2001 to 2005
install 452.500 lines of
pair gain system over Telecom Egypt Network
all over Egypt to increase the capacity
of Telecom Egypt Network installation.
- The prime minister of Egypt attends opening
of the project (Mokattam exchange)
Maintenance contract:
- Pacc responsible for the maintenance of
pair gain system lines, which installed
in Telecom Egypt.
- We have the leading edge to provide and install a complete lab (IC tester) for testing, measurement and fault finding for electronics units and PCB (in circuits & out of circuits.)
- We install more than 300 lab have been installed from Alex to Aswan
- Related movie
|
 |
|
Wireless
communications:
- Supply, installation and maintenance of the
following wireless solutions
- 1 DTEL link for 2 voice/ fax channel+ 1
Data channel in Egyptian Navy.
- 9 QTEL link for 4 voice/ fax/ Data channels
in Egyptian Navy.
- 6 QTEL link for 4 voice/ Fax/ Data channels
in Egyptian Army.
- 1 DTEL link for 1 voice/ Fax/ Data channel
in Qarun Petroleum Company.
- 1 PTEL link for 1 voice/ Fax/ Data channel
in Khalda Petroleum Company.
|
| Top |
|
|
|
 |
|
|
 |
|
|
|