Success Stories
 


Pair gain systems:

  • From 2001 to 2005
    install 452.500 lines of pair gain system over Telecom Egypt Network all over Egypt to increase the capacity of Telecom Egypt Network installation.
  • The prime minister of Egypt attends opening of the project (Mokattam exchange)


Maintenance contract:

  • Pacc responsible for the maintenance of pair gain system lines, which installed in Telecom Egypt.
  • We have the leading edge to provide and install a complete lab (IC tester) for testing, measurement and fault finding for electronics units and PCB (in circuits & out of circuits.)
  • We install more than 300 lab have been installed from Alex to Aswan
  • Related movie

 

 

Wireless communications:

  • Supply, installation and maintenance of the following wireless solutions

    - 1 DTEL link for 2 voice/ fax channel+ 1 Data channel in Egyptian Navy.
    - 9 QTEL link for 4 voice/ fax/ Data channels in Egyptian Navy.
    - 6 QTEL link for 4 voice/ Fax/ Data channels in Egyptian Army.
    - 1 DTEL link for 1 voice/ Fax/ Data channel in Qarun Petroleum Company.
    - 1 PTEL link for 1 voice/ Fax/ Data channel in Khalda Petroleum Company.


Top